{"id":18927,"date":"2022-07-26T10:34:00","date_gmt":"2022-07-26T08:34:00","guid":{"rendered":"https:\/\/stemin.it\/2022\/07\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\/"},"modified":"2025-09-09T11:49:54","modified_gmt":"2025-09-09T09:49:54","slug":"stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system","status":"publish","type":"post","link":"https:\/\/stemin.it\/en\/2022\/07\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\/","title":{"rendered":"Stemin S.p.A.: increasingly green production with additional 660 kWp photovoltaic system"},"content":{"rendered":"\n<p>At the Comun Nuovo (BG) site, the installation of a brand-new photovoltaic system has been completed to complement the existing plant: a total of <strong>1,038 monocrystalline solar modules<\/strong> have been installed on the roofs of the warehouses, adding to the <strong>more than 4,100 panels already in place<\/strong>.<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"769\" height=\"1024\" src=\"https:\/\/stemin.it\/wp-content\/uploads\/2025\/05\/FOTOVOLTAICO_FOTO-4-769x1024-1.jpeg\" alt=\"\" class=\"wp-image-17271\"\/><\/figure>\n\n<p>Specifically, 510 modules were installed on the roof of the Stemin S.p.A. warehouse at Via G. Marconi, 41 \u2013 24040 Comun Nuovo (BG), with a capacity of 269.9 kWp, and 528 modules on the warehouse at Via G. Marconi, 67, Comun Nuovo (BG), with a capacity of 302.4 kWp.<\/p>\n\n<p>The new modules chosen offer higher efficiency and lower annual performance losses, estimated at less than 1% per year.<\/p>\n\n<p>This installed capacity adds to the existing 1,032 kWp already present at the production site on Via G. Marconi, 67, Comun Nuovo (BG), which currently supplies around 22% of the total energy consumed.<\/p>\n\n<p>At full operation, the investment will create a total capacity of 1,604.3 kWp, corresponding to just under <strong>35% of the company\u2019s overall energy needs<\/strong>.<\/p>\n\n<p>This new photovoltaic park is an integral part of the development plan of Stemin S.p.A. and the <a href=\"http:\/\/fecs.it\" target=\"_blank\" rel=\"noreferrer noopener\">FECS Group<\/a>, of which Stemin S.p.A. is a part, aiming to further reduce greenhouse gas emissions by pursuing greater energy autonomy within a framework of <strong>sustainable development and protection of the environment and surrounding territory.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>At the Comun Nuovo (BG) site, the installation of a brand-new photovoltaic system has been completed to complement the existing plant: a total of 1,038 monocrystalline solar modules have been installed on the roofs of the warehouses, adding to the more than 4,100 panels already in place. Specifically, 510 modules were installed on the roof [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":18574,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[928],"tags":[],"class_list":["post-18927","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Stemin S.p.A.: increasingly green production with additional 660 kWp photovoltaic system | Stemin<\/title>\n<meta name=\"description\" content=\"At the Comun Nuovo (BG) site, the installation of a brand-new photovoltaic system has been completed to complement the existing plant: a total of 1,038\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/stemin.it\/en\/2022\/07\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Stemin S.p.A.: increasingly green production with additional 660 kWp photovoltaic system | Stemin\" \/>\n<meta property=\"og:description\" content=\"At the Comun Nuovo (BG) site, the installation of a brand-new photovoltaic system has been completed to complement the existing plant: a total of 1,038\" \/>\n<meta property=\"og:url\" content=\"https:\/\/stemin.it\/en\/2022\/07\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\/\" \/>\n<meta property=\"og:site_name\" content=\"Stemin\" \/>\n<meta property=\"article:published_time\" content=\"2022-07-26T08:34:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-09T09:49:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/stemin.it\/wp-content\/uploads\/2025\/05\/FOTOVOLTAICO_FOTO-2.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"768\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Vale0Studio0\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/stemin.it\\\/en\\\/2022\\\/07\\\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/stemin.it\\\/en\\\/2022\\\/07\\\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\\\/\"},\"author\":{\"name\":\"Vale0Studio0\",\"@id\":\"https:\\\/\\\/stemin.it\\\/en\\\/#\\\/schema\\\/person\\\/db36624040f1407adb7ad22902c35b15\"},\"headline\":\"Stemin S.p.A.: increasingly green production with additional 660 kWp photovoltaic system\",\"datePublished\":\"2022-07-26T08:34:00+00:00\",\"dateModified\":\"2025-09-09T09:49:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/stemin.it\\\/en\\\/2022\\\/07\\\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\\\/\"},\"wordCount\":227,\"publisher\":{\"@id\":\"https:\\\/\\\/stemin.it\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/stemin.it\\\/en\\\/2022\\\/07\\\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/stemin.it\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/FOTOVOLTAICO_FOTO-2.jpeg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/stemin.it\\\/en\\\/2022\\\/07\\\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\\\/\",\"url\":\"https:\\\/\\\/stemin.it\\\/en\\\/2022\\\/07\\\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\\\/\",\"name\":\"Stemin S.p.A.: increasingly green production with additional 660 kWp photovoltaic system | Stemin\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/stemin.it\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/stemin.it\\\/en\\\/2022\\\/07\\\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/stemin.it\\\/en\\\/2022\\\/07\\\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/stemin.it\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/FOTOVOLTAICO_FOTO-2.jpeg\",\"datePublished\":\"2022-07-26T08:34:00+00:00\",\"dateModified\":\"2025-09-09T09:49:54+00:00\",\"description\":\"At the Comun Nuovo (BG) site, the installation of a brand-new photovoltaic system has been completed to complement the existing plant: a total of 1,038\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/stemin.it\\\/en\\\/2022\\\/07\\\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/stemin.it\\\/en\\\/2022\\\/07\\\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/stemin.it\\\/en\\\/2022\\\/07\\\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\\\/#primaryimage\",\"url\":\"https:\\\/\\\/stemin.it\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/FOTOVOLTAICO_FOTO-2.jpeg\",\"contentUrl\":\"https:\\\/\\\/stemin.it\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/FOTOVOLTAICO_FOTO-2.jpeg\",\"width\":768,\"height\":1024},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/stemin.it\\\/en\\\/2022\\\/07\\\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/stemin.it\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Stemin S.p.A.: increasingly green production with additional 660 kWp photovoltaic system\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/stemin.it\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/stemin.it\\\/en\\\/\",\"name\":\"Stemin\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/stemin.it\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/stemin.it\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/stemin.it\\\/en\\\/#organization\",\"name\":\"Stemin\",\"url\":\"https:\\\/\\\/stemin.it\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/stemin.it\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/stemin.it\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/logo-stemin.svg\",\"contentUrl\":\"https:\\\/\\\/stemin.it\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/logo-stemin.svg\",\"width\":1,\"height\":1,\"caption\":\"Stemin\"},\"image\":{\"@id\":\"https:\\\/\\\/stemin.it\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/stemin.it\\\/en\\\/#\\\/schema\\\/person\\\/db36624040f1407adb7ad22902c35b15\",\"name\":\"Vale0Studio0\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/88068e3c1c333ac6148552a85f9cd8101e7dbb839218c5008b55bcaedfb62793?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/88068e3c1c333ac6148552a85f9cd8101e7dbb839218c5008b55bcaedfb62793?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/88068e3c1c333ac6148552a85f9cd8101e7dbb839218c5008b55bcaedfb62793?s=96&d=mm&r=g\",\"caption\":\"Vale0Studio0\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Stemin S.p.A.: increasingly green production with additional 660 kWp photovoltaic system | Stemin","description":"At the Comun Nuovo (BG) site, the installation of a brand-new photovoltaic system has been completed to complement the existing plant: a total of 1,038","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/stemin.it\/en\/2022\/07\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\/","og_locale":"en_US","og_type":"article","og_title":"Stemin S.p.A.: increasingly green production with additional 660 kWp photovoltaic system | Stemin","og_description":"At the Comun Nuovo (BG) site, the installation of a brand-new photovoltaic system has been completed to complement the existing plant: a total of 1,038","og_url":"https:\/\/stemin.it\/en\/2022\/07\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\/","og_site_name":"Stemin","article_published_time":"2022-07-26T08:34:00+00:00","article_modified_time":"2025-09-09T09:49:54+00:00","og_image":[{"width":768,"height":1024,"url":"https:\/\/stemin.it\/wp-content\/uploads\/2025\/05\/FOTOVOLTAICO_FOTO-2.jpeg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Written by":"Vale0Studio0","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/stemin.it\/en\/2022\/07\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\/#article","isPartOf":{"@id":"https:\/\/stemin.it\/en\/2022\/07\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\/"},"author":{"name":"Vale0Studio0","@id":"https:\/\/stemin.it\/en\/#\/schema\/person\/db36624040f1407adb7ad22902c35b15"},"headline":"Stemin S.p.A.: increasingly green production with additional 660 kWp photovoltaic system","datePublished":"2022-07-26T08:34:00+00:00","dateModified":"2025-09-09T09:49:54+00:00","mainEntityOfPage":{"@id":"https:\/\/stemin.it\/en\/2022\/07\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\/"},"wordCount":227,"publisher":{"@id":"https:\/\/stemin.it\/en\/#organization"},"image":{"@id":"https:\/\/stemin.it\/en\/2022\/07\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\/#primaryimage"},"thumbnailUrl":"https:\/\/stemin.it\/wp-content\/uploads\/2025\/05\/FOTOVOLTAICO_FOTO-2.jpeg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/stemin.it\/en\/2022\/07\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\/","url":"https:\/\/stemin.it\/en\/2022\/07\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\/","name":"Stemin S.p.A.: increasingly green production with additional 660 kWp photovoltaic system | Stemin","isPartOf":{"@id":"https:\/\/stemin.it\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/stemin.it\/en\/2022\/07\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\/#primaryimage"},"image":{"@id":"https:\/\/stemin.it\/en\/2022\/07\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\/#primaryimage"},"thumbnailUrl":"https:\/\/stemin.it\/wp-content\/uploads\/2025\/05\/FOTOVOLTAICO_FOTO-2.jpeg","datePublished":"2022-07-26T08:34:00+00:00","dateModified":"2025-09-09T09:49:54+00:00","description":"At the Comun Nuovo (BG) site, the installation of a brand-new photovoltaic system has been completed to complement the existing plant: a total of 1,038","breadcrumb":{"@id":"https:\/\/stemin.it\/en\/2022\/07\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/stemin.it\/en\/2022\/07\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/stemin.it\/en\/2022\/07\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\/#primaryimage","url":"https:\/\/stemin.it\/wp-content\/uploads\/2025\/05\/FOTOVOLTAICO_FOTO-2.jpeg","contentUrl":"https:\/\/stemin.it\/wp-content\/uploads\/2025\/05\/FOTOVOLTAICO_FOTO-2.jpeg","width":768,"height":1024},{"@type":"BreadcrumbList","@id":"https:\/\/stemin.it\/en\/2022\/07\/stemin-s-p-a-increasingly-green-production-with-additional-660-kwp-photovoltaic-system\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/stemin.it\/en\/"},{"@type":"ListItem","position":2,"name":"Stemin S.p.A.: increasingly green production with additional 660 kWp photovoltaic system"}]},{"@type":"WebSite","@id":"https:\/\/stemin.it\/en\/#website","url":"https:\/\/stemin.it\/en\/","name":"Stemin","description":"","publisher":{"@id":"https:\/\/stemin.it\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/stemin.it\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/stemin.it\/en\/#organization","name":"Stemin","url":"https:\/\/stemin.it\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/stemin.it\/en\/#\/schema\/logo\/image\/","url":"https:\/\/stemin.it\/wp-content\/uploads\/2025\/05\/logo-stemin.svg","contentUrl":"https:\/\/stemin.it\/wp-content\/uploads\/2025\/05\/logo-stemin.svg","width":1,"height":1,"caption":"Stemin"},"image":{"@id":"https:\/\/stemin.it\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/stemin.it\/en\/#\/schema\/person\/db36624040f1407adb7ad22902c35b15","name":"Vale0Studio0","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/88068e3c1c333ac6148552a85f9cd8101e7dbb839218c5008b55bcaedfb62793?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/88068e3c1c333ac6148552a85f9cd8101e7dbb839218c5008b55bcaedfb62793?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/88068e3c1c333ac6148552a85f9cd8101e7dbb839218c5008b55bcaedfb62793?s=96&d=mm&r=g","caption":"Vale0Studio0"}}]}},"_links":{"self":[{"href":"https:\/\/stemin.it\/en\/wp-json\/wp\/v2\/posts\/18927","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stemin.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stemin.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stemin.it\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/stemin.it\/en\/wp-json\/wp\/v2\/comments?post=18927"}],"version-history":[{"count":3,"href":"https:\/\/stemin.it\/en\/wp-json\/wp\/v2\/posts\/18927\/revisions"}],"predecessor-version":[{"id":19300,"href":"https:\/\/stemin.it\/en\/wp-json\/wp\/v2\/posts\/18927\/revisions\/19300"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stemin.it\/en\/wp-json\/wp\/v2\/media\/18574"}],"wp:attachment":[{"href":"https:\/\/stemin.it\/en\/wp-json\/wp\/v2\/media?parent=18927"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stemin.it\/en\/wp-json\/wp\/v2\/categories?post=18927"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stemin.it\/en\/wp-json\/wp\/v2\/tags?post=18927"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}